MUMBAI METRO RAIL CORPORATION LIMITED (MMRCL) appointed PADECO as the Interim Consultant (IC) to provide requisite services for the final location survey, preliminary designs suitable for tendering, bid documents, pre-qualification of bidders, and selection of preferred bidder, awaiting the appointment of General Consultant (GC) for the project.
The objective of this service is to take up requisite activities in advance, for the execution of civil works of Metro Line 3-Colaba Bandra Seepz so that delay in starting project implementation after the JICA loan is sanctioned is minimized.
To finalize Schedule of Dimensions and Design Basis Report.
To prepare preliminary designs for civil works (conducting final location survey for the alignment, stations & car shed, detailed geotechnical surveys, utility Surveys & relocation plans, finalizing construction methodology for tunnels & stations)
Interaction and coordination with JICA Expert team on preliminary designs and tender documents etc.
Prequalification of contractors for “design and build” civil contract packages;
Preparation of tender designs and documents for “design and build” civil contracts
Packaging of civil contracts for underground section i.e. tunnels and stations;
To assist MMRCL in the evaluation of PQ and bids received for civil contracts;
Until the General Consultants (GC) are in position, undertake all required project management activities on mutually agreed terms.