Detailed Project Report for Goregaon Mulund link road of 4.75 km connecting Eastern and Western Expressway through tunnel section.

Client: Municipal Corporation of Greater Mumbai (MCGM).

Goregoan Mulund link road is a 4.75 km long (3+ 3) lane road including an approach road connecting Mulund on the Eastern expressway to Goregaon on the Western Expressway via Sanjay Gandhi National Park (SGNP) through a tunnel section.

Mumbai

PADECO INDIA team is participating in the below tasks for this project:

Bid process management.

Peer review of Detailed Project Report.

Finalization of Suitable shortest route Alignment.

Engineering Survey and Geotechnical Investigations.

Traffic and Dispersal study, Project affected people (PAP)/Land acquisition.

Preparation of General Arrangement Drawings (GAD).

Preparation of Preliminary Design.

Supply and MEP work including an advanced Control system.

Preparation of Design-Based report.

Environmental impact assessment.