Goregoan Mulund link road is a 4.75 km long (3+ 3) lane road including an approach road connecting Mulund on the Eastern expressway to Goregaon on the Western Expressway via Sanjay Gandhi National Park (SGNP) through a tunnel section.
Bid process management.
Peer review of Detailed Project Report.
Finalization of Suitable shortest route Alignment.
Engineering Survey and Geotechnical Investigations.
Traffic and Dispersal study, Project affected people (PAP)/Land acquisition.
Preparation of General Arrangement Drawings (GAD).
Preparation of Preliminary Design.
Supply and MEP work including an advanced Control system.
Preparation of Design-Based report.
Environmental impact assessment.